Here is a quick run down of the evolution of the tile work I've completed with this saw:
- House in Dallas - Guest bathroom shower wall patch job
- House in Dallas - Master bathroom floor
- House in Dallas - Study bathroom floor and shower
- Meredith's Parents' House - Upstairs bathroom floor (no pics)
- Our House - Bathroom floor and wall (angle grinder was used for circular cuts)
- Our House - Kitchen floor
- Our House - Front hall and fireplace hearth (pics coming soon)
We have about four tile jobs left (fireplace wall, kitchen backsplash, basement bathroom, basement laundry/furnace room), so we'll see if this saw can last just a little while longer.